How it went
The owners were looking for a plot around Košice, a south-facing slope. Building on site would have meant carrying all the material up the hill and storing it there. So they chose modules made in the hall.
On site it took a crane and 300 to 400 metres of transport across a field. Marek says the installation was demanding, but with the right timing and choice of carriers it can be done.
The wall with straw panels is plastered with clay. There are heating mats in the wall, so heat radiates directly from the plaster. The owner describes the feeling inside as a pleasant, warming heat.